If you want a new deck, patio, retaining wall or pergola finished by summer, the step most homeowners forget is HOA approval. In Highlands Ranch, almost every outdoor project needs a sign-off from the Highlands Ranch Community Association before any work can start, and that review takes time.
The good news is that HOA approval in Highlands Ranch is not hard when you plan for it. This guide walks through what needs approval, how long it really takes, what your application should include, and how to time everything so your project is ready to build when the ground thaws in spring.

Does My Project Need HOA Approval in Highlands Ranch?
Almost certainly yes. According to the Highlands Ranch Community Association, all exterior home improvements need approval from its Architectural Review Committee. That includes decks, patios, retaining walls, pergolas, pools, hot tubs, fences and major landscaping changes.
It even applies to work that seems like a simple swap. Replacing an old wood deck with a composite one, or rebuilding a wall in the same spot, still counts as an exterior change and still needs approval. The HRCA reviews against its Residential Improvement Guidelines, which set the rules for things like size, placement, materials and colors.
If you live outside Highlands Ranch, in Littleton, Castle Rock, Lone Tree or Sterling Ranch for example, your neighborhood may have its own HOA or design review board with its own rules. The steps below still apply. Only the names and forms change.
HOA Approval vs a Building Permit
People often mix these up, but they are two separate approvals from two different groups. You may need one, or you may need both.
| HOA approval | Building permit | |
|---|---|---|
| Who gives it | Your HOA, which in Highlands Ranch is the HRCA Architectural Review Committee | The county or city, which in Highlands Ranch is the Douglas County Building Division |
| What they look at | How the project looks and fits the neighborhood: size, placement, materials and colors | Whether the structure is safe: footings, framing, guards, stairs and loads |
| Which projects | Almost every exterior change | Mainly structures such as most decks, taller retaining walls and some pergolas and covers |
| Typical timing | Up to 30 days for the HRCA to decide, sometimes longer with a sub-association | Depends on the county workload and the project |

Having one approval does not cover the other. For decks especially, plan for both. Our guide to getting a permit for deck construction explains when Douglas County requires one and what the inspections involve.
How Long Does HOA Approval in Highlands Ranch Take?
The HRCA has up to 30 days to make a decision once it has a complete application. Larger or more complex requests go to the Architecture Committee, which meets on the first and third Wednesday of each month. Those requests need to be in by noon on the Friday before the meeting.
On top of that, many Highlands Ranch neighborhoods have a sub-association with its own architecture committee. If yours does, it may review the request after the HRCA, which adds more time. And if the committee asks for changes, you resubmit and the clock starts again.
Put together, it is smart to allow four to eight weeks for HOA approval in Highlands Ranch, and to start before you want the build to begin, not after.

5 Steps to Get HOA Approval in Highlands Ranch on Time
1. Start the design in winter
Spring is when everyone wants their outdoor project built, so it is also when HOA queues and contractor schedules fill up. Getting the design settled in December or January means your application can go in early, while the committee is less busy.
2. Read the guidelines for your project type
Before anything is drawn, check the HRCA Residential Improvement Guidelines for your type of project. They cover things like how close a structure can be to the property line, how high it can be, and which materials and colors fit. Designing to the rules from the start is much faster than redesigning after a rejection.
3. Put together a complete application
Most delays come from missing information. A strong application usually includes a site plan showing where the project sits on your lot and its distance from property lines, drawings with the size and height, the materials you plan to use, and the color of each one, ideally with photos or manufacturer samples.
For a composite deck, that means naming the board line and color, the railing style and the color of the posts and trim. For a paver patio or retaining wall, it means the product name, color blend and wall height. For an aluminum pergola, it means the size, height, finish color and where it sits relative to the house.
4. Submit early and check for a sub-association
Use the HRCA home improvement form for your project type and attach your documents. Find out at the same time whether your neighborhood has a sub-association, and if it does, what it needs from you. Knowing this up front avoids a surprise second review after the first one is approved.
5. Get the permit lined up after approval
Once the HOA signs off, any building permit can go in. With both approvals in hand before spring, the build can start as soon as the weather allows instead of waiting in line with everyone else.

A Simple Timeline for a Spring Build
Here is how the months usually line up for a project you want built in April or May. Every project is different, but working back from the build date like this keeps you out of the spring rush.
| When | What happens |
|---|---|
| December to January | Onsite visit, measurements and design, checked against your HOA guidelines |
| January to February | HOA application goes in, plus any sub-association review |
| February to March | HOA approval comes back, building permit goes in if one is needed |
| March to April | Permit approved, materials ordered and the build is scheduled |
| April to May | Build starts as soon as the ground and weather allow |
Tips by Project Type
Each type of project gets looked at a little differently during HOA approval in Highlands Ranch. Here is what committees tend to focus on for each one.
Decks
Decks usually need both HOA approval and a building permit. The HOA will want the deck size, height, board color and railing style. Darker composite colors and black aluminum railings are common choices, but check your guidelines before settling on a color.
Patios and walkways
Ground-level patios are usually simpler to approve, but the committee still wants to see the size, the paver or concrete finish and the color. Show how water drains off the patio, especially if it slopes toward a fence line.
Retaining walls
Wall height matters most. Taller walls may need an engineered design and a building permit on top of HOA approval. Include the block or stone product, the color and how the wall drains.
Pergolas and shade structures
Committees look closely at height, placement and color, since a pergola can be seen from next door. Freestanding and attached pergolas may be treated differently, so note which one you are planning.
Pools and hot tubs
Pools need the most planning: placement, fencing, equipment location and drainage all come into play, along with a building permit. Starting the paperwork in late fall or winter is the best way to swim the next summer.
Common Reasons Applications Get Sent Back
Most rejections are avoidable. The usual causes are a missing site plan or measurements, materials or colors that are not specified, a structure that sits too close to a property line, a design that is too tall for the guidelines, and drainage that sends water toward a neighbor. Each of these can be caught before the application goes in.
Drainage deserves a special mention around here. Highlands Ranch sits on clay soil that swells when wet, so committees and neighbors care about where water goes. Our guide to expansive clay soil covers why it matters for patios, walls and decks.
What Happens If You Build Without Approval?
Building first and asking later is risky. The HRCA has a covenant violation process that starts with a courtesy notice and can move on to fines if the issue is not fixed. In the worst case you may be asked to change or remove the work, which costs far more than waiting a few weeks for approval. Unapproved work can also cause problems when you sell the house.
How We Help With HOA Approval in Highlands Ranch
Every project we take on starts with an onsite visit. We measure the space, look at drainage and access, and plan the design around your HOA guidelines from the start. We then put together the drawings, materials and color details your HOA asks for, so your application goes in complete the first time.
Because we build composite decks, patios, retaining walls, pergolas and pools under one roof, one plan can cover the whole project, which also makes it easier for the committee to review.
HOA Approval in Highlands Ranch FAQ
Do I need HOA approval to replace my old deck?
Yes. The HRCA treats replacements as exterior changes too, even when the new deck is the same size and in the same place.
How long does HRCA approval take?
The HRCA has up to 30 days to decide on a complete application. Larger requests go to the Architecture Committee, and a sub-association review can add more time, so plan for four to eight weeks in total.
Can work start while I wait for approval?
No. Wait for written approval, and for any building permit, before work starts. Starting early can lead to violation notices and fines.
Does HOA approval replace the building permit?
No. They are separate. The HOA looks at appearance and fit, and the county looks at safety. Many projects need both.
Wrap-up
HOA approval in Highlands Ranch is one more step, but it is a predictable one. Start the design in winter, follow the guidelines, send in a complete application and allow four to eight weeks, and your spring project can start on time.
Planning a deck, patio, wall or pergola for next spring? Call Elevate Landscape & Spas at (303) 718-4619 to book an onsite visit and get a quote, or contact us online.
Rather We Call You?
Leave your name and number and we’ll call you back — usually the same day. Or call us now on (303) 718-4619.
Rather write it down?
✎ Send us your project details




One thought on “HOA Approval in Highlands Ranch: 5 Smart Steps to Get Your Spring Project Approved”